• Font Size    
E-mail

Close Window E-mail This Page

Work Begins On Left Wall Of Bay Bridge Span

Required fields are marked with an asterisk(*)



The information you provide will be used only to send the requested e-mail and will not be used to send any other e-mail communications. Read more in our Privacy Policy

Send E-mail

   Print     Share +   

Work Begins On Left Wall Of Bay Bridge Span

BALTIMORE (AP) ― The Maryland Transportation Authority says it has completed testing on the wall on the left side of the eastbound span of the Bay Bridge and has found evidence of corrosion of steel bolts inside the concrete barrier.

The left lane was closed Wednesday for round-the-clock work the strengthen the left parapet at both ends of the span. The repairs are similar to those recently completed on the right parapet.

The lane closure means the westbound span will operate with two-way traffic Wednesday from 9 a.m. to 9 p.m., Thursday and Friday, from 9 a.m. to 10 p.m. and Saturday from 7 a.m. to 9 p.m.

Commuters will still have three westbound lanes for the morning rush and for the return from the Eastern Shore on the weekend.

(© 2009 The Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten, or redistributed.)

WJZ.COM's Most Popular Slideshows

You need the latest Flash player to view video content.
Click here to download.

Click here to bypass this detection if you already have the latest Flash Player.